KNOWLEDGE SHARE

Knowledge Share http://expeditionworkshed.org/workshed/push-me-pull-me/

Like

https://www.facebook.com/pages/Skyscraper-Creators/424290814274074

RAIN WATER HARVESTING

Image

SAVE THE GROUND WATER

Image
SAVE THE GROUND WATER Remove the Mesquite Tree (mullu maram/Vellikattan) from the open ground and keep the ground clean for to avoid the future growing. This tree will reduce the ground water table level easily and quickly.             Mesquite is an extremely hard tree. This can draw water from the ground water table through its long roots.             The research, Roots will travelling up to 175 ft depth. The tree can easily and fast switch the location and grow from once water source to other locations. Don't allow this tree the grow area like village pond, well & bore holes Save the Ground water Table.. 

BITUMEN SHEET –LOAD BEARING WALL – CONCRETE SLAB

Image
BITUMEN SHEET –LOAD BEARING WALL – CONCRETE SLAB ADVANTAGES 1.        Load transfering to the load bearing walls equally 2.        Suspension between load bearing walls and concrete slab 3.        Avoid wall plastering cracks in the wall & concrete joints HOW TO USE – STEPS 1.        Finishing The Brick Wall Construction Required Level 2.        Leveling(Flat) The Wall Top Surface With Cement Mortar 3.        Curing The Top Surface 1 Day 4.        Place The BITUMEN SHEET Over The Top Wall 5.        Place The Reinforcement And Cast The Concrete 6.        Plaster The Wall As Usual

BAMBOO MAT – CONCRETE ROOF SLAB

Image
BAMBOO MAT –RCC ROOF SLAB ADVANTAGES 1.        To avoid the cement paste bleeding 2.        The concrete slab ceiling will get rough surface and get the ceiling plaster will be in good bondage. HOW TO USE – STEPS 1.        Finishing The Roof Slab Centering(Scaffolding) Work 2.        Check All The Level Of Slab Centering & Remove The Debris 3.        Place The BAMBOO MAT Over The Centering 4.        Now Place The Reinforcement Bars And Concrete 5.        Cast The Slab 6.        While Remove The Centering (Scaffolding), Remove The BAMBOO MAT 7.        Now The Ceiling Will Appears BAMBOO Impressions 8.        Enough For Plastering Mortar Bonding.

CIVIL ENGINEERING SOFTWARE

CIVIL ENGINEERING SOFTWARES Drawing   Drafting   Tool –Computer Aided Drawings AutoCAD BricsCAD MicroStation Rebar   Detailing Tools – Rebar   Quantity   & Arrangements RGS Rebar CADSRC LOHA 3D modeling   -Building Information Modeling Revit   Architecture VRAY Photoshop 3D Max SketchUp Steel   Structure Modeling Tekla Structures Revit Structures Analysis and Design STAAD pro ETAB RAPT RAM ANSYS STRUDS SAP Estimation & Quantity Surveying Estimator QSPlus Planning MS Project Primavera MS Visio Other MS office,Geo Slope

LIKE US

https://www.facebook.com/pages/Skyscraper-Creators/424290814274074

WEATHERING PROOF FOR ROOF SLAB

WEATHERING PROOF FOR ROOF SLAB CONVENTIONAL METHOD NEW METHOD 1.        Loads on roof slab – More weight, because of brick bats 1.        Loads on roof slab – No weight, No brick bats used – Laying Cool roof tiles above the roof with appropriate water slope 2.        Structural Design – Dead load on roof -2KN/m 2 (Brick bats and others)+0.42KN/m 2 (Tiles) 2.        Structural Design – Dead load on roof -0.42KN/m 2 (Tiles) only. This will reduce the foundation cost. 3.        Rain water leakage – leakage occurring 3.        Rain water leakage – leakage proof 4.        Sun heat reflection – Very less 4.        Sun heat reflection – 100% reflection 5.        Red Clay tile weight – 2kg (approxim...